Paleis 5

For the Brussels Exhibition Park, Tri-Monta handled the construction and assembly of HEA profiles weighing some 27 tons. These profiles make it possible to attach lighting and sound structures under the existing airco system.
Stretch cables were attached to the existing concrete joists using HILTI chemical HUV anchors. Using the stretch cables, the profiles can be aligned horizontally.
Tri-Monta was able to reduce the total time required for this job to 5 days, which meant that Hall 5 was out of commission for this short period only.